Murray Dam Near Term Repairs
Work consists of dam near term repairs.
Description: Dam near term repairs.
City · CA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityCA
Posted
Apr 24, 2026
Dec 1, 2026
Work consists of dam near term repairs.
U.S. Army Engineer District Mobile
FederalAL
Posted
-
Oct 20, 2026
To perform concrete rehabilitation and retro t existing structural elements that have been impacted by concrete expansion due to alkali-silica reactivity (asr). The scope of work includes, but is not limited to: structural concrete demolition of existing pier stoplog slots; installation of new steel stoplog guides and embedded seal plates; placement of specialized shrinkage-compensating concrete; and recessing of side seal plates. Additional mechanical and structural work includes replacing side and bottom seals on four (4) tainter gates and replacing seals on eight (8) stop logs. The contractor will be fully responsible for the design, fabrication, and installation of temporary dewatering structures (tds)/co erdams and temporary gate support shoring.
Wisconsin Department of Administration
State AgencyWI
Posted
Sep 8, 2026
Oct 28, 2026
In general, the work consists of: the removal of an earthen dam at Wildlife Area; and earthwork, maintenance, and repairs of earthen berms, removal of two water control structures, and the replacement of two culvert pipes, at the Wildlife Area. Earthwork at Princes Point includes excavation and repair of muskrat holes, filling low spots, and lowering of a 200 ft portion of the north berm.
Wisconsin Department of Administration
State AgencyWI
Posted
Sep 16, 2026
Oct 28, 2026
Work consists of: maintenance and repairs of earthen berms, replacement of the bachhuber pumphouse structure, hydraulic and mechanical dredging, restoration of gravel paths, and replacement of water control structures. Earthwork includes excavation and repair of muskrat holes, filling approx 8,000 LF of the I-1 and I-2 berms to raise the berms.