CityCA
Posted
Oct 6, 2026
Dec 1, 2026
Murray Dam Near Term Repairs
Dam near term repairs.
Description: Work consists of dam near term repairs.
City · CA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of San Diego.
Adjacent opportunities open for bidding right now.
CityCA
Posted
Oct 6, 2026
Dec 1, 2026
Dam near term repairs.
CountyGA
Posted
-
Nov 19, 2026
Structural concrete repairs to the dam spillway structure.
U.S. Army Engineer District Mobile
FederalAL
Posted
-
Oct 20, 2026
To perform concrete rehabilitation and retro t existing structural elements that have been impacted by concrete expansion due to alkali-silica reactivity (asr). The scope of work includes, but is not limited to: structural concrete demolition of existing pier stoplog slots; installation of new steel stoplog guides and embedded seal plates; placement of specialized shrinkage-compensating concrete; and recessing of side seal plates. Additional mechanical and structural work includes replacing side and bottom seals on four (4) tainter gates and replacing seals on eight (8) stop logs. The contractor will be fully responsible for the design, fabrication, and installation of temporary dewatering structures (tds)/co erdams and temporary gate support shoring.
Posted
Oct 14, 2026
Nov 12, 2026
Project includes the installation, maintenance, and removal of erosion and sediment control measures. Installation, implementation, and coordination of traffic control plan, and removal at completion of construction. Stripping and stockpiling topsoil. Demolition of existing concrete dam and associated infrastructure. Control of surface water and dewatering of subgrades in areas of work. Excavation and placement of select fill, topsoil and seeding.