Virginia Community College System
Higher EducationVA
Posted
Sep 15, 2026
Oct 14, 2026
Replace Cooling Tower at Science Building at Tidewater Community College, Virginia Beach Campus
Work includes replacing cooling tower and associated work.
Description: Work consists of approx. a new technical education building on a mostly cleared site. The building will be approximately 53,000 SF and will include Automotive and Diesel Technology, Construction Technology, HVAC, Electrical and Electronics, Industrial Maintenance Technology, and Welding labs as well as classrooms, administration, and building support spaces. The building exterior will include a mix of masonry, including some stone accents, insulated metal panel systems, and curtain wall framing. The roofing will be a two-ply modified bitumen system. The project is designed with the intent to achieve LEED Silver certification. Commissioning of the building systems and building envelope are included in the scope of work. Plumbing systems consist of domestic water, sanitary sewer, and storm sewer. Compressed air and welding gas systems are also present in labs. The HVAC system is largely geothermal water-source heat pumps and energy recovery units. Electric heaters, mini-split heat pump systems, and direct gas fired heater with exhaust ventilation will also be utilized. The electrical system will include incoming utility infrastructure and an emergency natural gas generator. Other related systems include fire alarm, data, access controls infrastructure, local sound system infrastructure, and infrastructure for classroom technology equipment.
HigherEducation · KY, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Virginia Community College System
Higher EducationVA
Posted
Sep 15, 2026
Oct 14, 2026
Work includes replacing cooling tower and associated work.
Virginia Community College System
Higher EducationVA
Posted
-
Nov 5, 2026
Sealed bids are invited for construction of the CE Replace AHUs project, Project Code M25NV120, at Northern Virginia Community College’s Annandale Campus. The work generally includes replacing air handling units 1–3, return fans, and associated controls. Bids may be submitted electronically through eVA or delivered to the Virginia Community College System in Richmond, and are due at 2:00 p.m. on November 5, 2026.
Illinois Department of Natural Resources
State AgencyIL
Posted
Oct 8, 2026
Oct 27, 2026
The project involves removing and replacing boilers and pumps in the Brunsvold Building. It also includes replacing the expansion tank, chemical feed system, steam humidification generators, domestic water heater, and water treatment system. Associated electrical components are included in the project.
Chesapeake Bay Bridge And Tunnel District
Special DistrictVA
Posted
-
Oct 30, 2026
Procurement for the installation of four (4) new 40kVa Uninterruptible Power Supply (UPS) units and associated minor building renovations at the Chesapeake Bay Bridge and Tunnel Ventilation Buildings.
Decision makers connected to this RFP from Kentucky Community and Technical College System.