ATC Replace Chilled Water Central Plant at Tidewater Community College, Virginia Beach Campus *Design-Build*
Posted
Oct 6, 2026
Nov 19, 2026
The work generally includes: Replacement of two (2) water-cooled chillers, two (2) cooling towers, two (2) condenser water pumps, four (4) chilled water pumps, and replacement/reconfiguration of the hydronic piping and accessories throughout the mechanical room and courtyard.

