Work includes small public water relocation no 01, small public sewer relocation no 01, cpm progress schedule, clearing and grubbing within right of way, removal of structures and obstructions, removal and disposal of existing pavement 1,777.000 SY, removal and disposal of existing asphalt pavement 155.000 SY, removal and disposal of existing bridge, removal and disposal of existing bridge, unclassified excavation 3,104.000 CY, borrow excavation 22,193.000 CY, geogrid reinforcement (uniaxial) 1,995.000 SY, wet and dry excavation for bridges 485.000 CY, temporary shoring system 290.000 LF. See attached file.