Georges Creek WRRF EQ Upgrades Division I
Posted
Oct 2, 2026
Nov 2, 2026
Project consists of constructing a concrete liner in an existing 6-MG flow equalization basin, installing basin fill and drain piping, installing floating mixers in the basin, installing associated electrical and instrumentation and controls components, and associated site work. The force main and associated control valving to control flow to and from the basin are being constructed under a separate contract (Division II).
