Madison Metropolitan Sewer District
Special DistrictWI
Posted
Oct 13, 2026
Nov 3, 2026
Engine 3-Way Valve Replacement RFP
The Engine 3-Way Valve Replacement project involves replacing four thermostatically controlled 3-way valves with rotary electric valves. The District operates two Waukesha engines and each engine has two 3-way valves that regulate the flow of jacket water to a radiator and heat exchanger. This project also includes necessary piping modifications and power and control wiring.
