Ohio Department of Transportation
State AgencyOH
Posted
Sep 18, 2026
Oct 29, 2026
SIDEWALK C/R/S: COL EL Riverfront Trail Phase1.1
The solicitation is for construction of a 0.62-mile sidewalk connecting downtown East Liverpool to the riverfront. The work includes a prefabricated retaining wall, drainage, and water work. ODOT’s project record identifies it as the COL EL Riverfront Trail Phase1.1 sidewalk project, PID 117785.
