North Street Storm Sewer Replacement *REBID*
Work includes to remove a variable size and shape stormwater culvert at and around and replace with 36" circular reinforced concrete pipes.
Description: Project consists of removing an existing 6" water line and installing a new 6"waterline along with a 12"storm sewer. The proposed 6" water line is 443 LF and is connecting to a 6" water line and a 4" water line. There will be two vales on this main line, and two fire hydrant assembly. The proposed 12" storm sewer is 298 LF, and along it there will be 3 2x2 catch basins. Existing grade will need to be sloped to fall to the catch basins.
City · OH, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalThese related opportunities are still open for bidding.
CityNC
Posted
-
Oct 22, 2026
Work includes to remove a variable size and shape stormwater culvert at and around and replace with 36" circular reinforced concrete pipes.
CityNC
Posted
Sep 24, 2026
Oct 22, 2026
The Town of Chapel Hill is requesting bids for the removal and replacement of a storm sewer network, including a stormwater culvert and associated sanitary sewer and waterline adjustments, at and around 116 North Street.
CityPA
Posted
Oct 3, 2026
Oct 27, 2026
2025 SWS Elizabeth Street Storm Sewer Project.
CityME
Posted
Sep 3, 2026
Oct 21, 2026
Work includes approx 4,000 LF of 8” sanitary sewer; 14 EA of pre-cast manholes; 1,600 LF of 4" and 6" sanitary sewer services, including all materials, equipment, and labor to conduct project pipe installation, traffic control, excavation, backfill, compaction, trench paving, erosion control and all other work required for complete project.