CountyLA
Posted
Oct 9, 2026
Nov 5, 2026
2026 CWEF Water System Improvements Project RFP
Work includes new water mains, valves, fittings, flush valves, connections, and associated appurtenances.
Description: Work includes approx 8 LF of 8" PVC C900 water line; 5,975 LF of 12" PVC C900 water line; 395 LF of 3/4" pure-core water line service; 223 LF of 8" PVC C900 water line; 24 LF of 2" pan concrete curb & gutter; 23 SY of 6" concrete flatwork; 1,598 SY of 5" asphalt paving; 340 LF of 8" PVC C900 water line; 245 LF of 3/4" pure-core water line service; 308 LF of 4" blueboard insulation; 2,065 LF of 12" PVC C900 water line; 20 LF of 3/4" pure-core water line service; 320 LF of 2" HDD water line; 10 LF of 4" water line direct bury.
City · CO, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from City of Rifle.
These related opportunities are still open for bidding.
CountyLA
Posted
Oct 9, 2026
Nov 5, 2026
Work includes new water mains, valves, fittings, flush valves, connections, and associated appurtenances.
CityIN
Posted
Sep 9, 2026
Nov 5, 2026
Work includes approx 1 LS meter system network infrastructure; 14 SY HMA pavement restoration; 1 LS erosion control.
CountyGA
Posted
Sep 14, 2026
Oct 22, 2026
Work includes approx 80 LF of 16" steel casing, jack & bore; 550 LF of 10" DIP-water, zinc coated; 820 LF of 12" DIP-water, zinc coated; fire hydrants, valves, and associated infrastructure work.
CityIL
Posted
Sep 1, 2026
Oct 19, 2026
The work generally consists of removal and replacement of galvanized services and lead appurtenances at various locations throughout the village. The work will include but not limited to, the furnishing and installation of new water service line, new water service connections to existing lines, new yokes, new meter pits, and relocation of existing meter pit for new service line and connection. There will be re-plumbing needed at specific locations to be determined during construction. The new service line replacement and connections will be based on field conditions for each replacement to allow for the most ideal replacement location based on complexity of each various location. This work also includes surface restoration with various pavements, curbing, and sidewalks. This work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the contract documents.