CityIL
Posted
Sep 30, 2026
Dec 3, 2026
Advanced Metering Infrastructure (AMI) - Request for Proposal
Provide an advanced metering infrastructure (AMI) system for its electric utility.
Description: Provide and install approx 841 water meters from 3/4" to 6" (775-3/4", 18-1", 18-1 1/2", 20-2",7-4", 3-6") and an advanced metering infrastructure (AMI) system.
City · GA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityIL
Posted
Sep 30, 2026
Dec 3, 2026
Provide an advanced metering infrastructure (AMI) system for its electric utility.
CityCA
Posted
Sep 30, 2026
Nov 17, 2026
Provide a full turnkey AMI solution. The work shall include system design, procurement, installation, testing, commissioning, training, and ongoing support. Contractor shall evaluate existing Sensus meters and determine compatibility with proposed AMI endpoints. Where feasible, existing meters may be retained; however, the Contractor shall ensure that the final system meets all performance requirements regardless of reuse strategies.
CityCA
Posted
Sep 30, 2026
Nov 17, 2026
Provide a full turnkey AMI solution. The work shall include system design, procurement, installation, testing, commissioning, training, and ongoing support. Contractor shall evaluate existing Sensus meters and determine compatibility with proposed AMI endpoints. Where feasible, existing meters may be retained; however, the Contractor shall ensure that the final system meets all performance requirements regardless of reuse strategies.
CityFL
Posted
Sep 25, 2026
Oct 26, 2026
The city is seeking proposals for a turnkey Advanced Metering Infrastructure (AMI) water utilities system. The current need is for replacement of all meters, registers and endpoints for meters between sizes 3/4" and 2" and replacement of endpoints or connection of the existing meter to the proposed data management system for meters from 2 inches to 8 inches, within the city's meter reading platform.
Decision makers connected to this RFP from City of Zebulon.