Indiana Department of Transportation
State AgencyIN
Posted
Oct 13, 2026
Oct 27, 2026
Description: For INDOT RFP 2610, item 22020, the selected firm will provide design and plan-development work for construction documents across four contracts comprising eight DES numbers. The projects include bridge replacements on SR 56, SR 59, and SR 168; superstructure replacements on SR 145; a deck overlay on US 231; and a small-pipe project on SR 356 in Dubois, Gibson, Greene, Perry, and Pike Counties. Services include environmental and ecological work, permits, surveys, roadway and bridge design, utility coordination, right-of-way plan development, title research, geotechnical services, applicable pavement design, and construction-phase services.
StateAgency · IN, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Indiana Department of Transportation.
Adjacent opportunities open for bidding right now.
Indiana Department of Transportation
State AgencyIN
Posted
Oct 13, 2026
Oct 27, 2026
INDOT's RFP item 22103, listed under RFP No. 2610, seeks a consultant to develop construction contract documents for projects in Greene, Lawrence, and Martin Counties, including pavement replacement on US 231, an intersection improvement and a small pipe project on US 50, a small structure replacement on SR 157, and two US 50 bridge-painting projects. The selected firm will provide project development services including environmental and ecological services, permits, topographic survey, roadway, bridge and lighting design, utility coordination, right-of-way plan development, title research, and construction-phase services. INDOT will provide real-estate, railroad-coordination, and geotechnical services, plus pavement design for DES 2600672 and 2600654; the consultant will provide pavement design for other included DES if non-standard.
Indiana Department of Transportation
State AgencyIN
Posted
Oct 13, 2026
Oct 27, 2026
This is a consultant-services procurement, not a grant, for project-development work supporting bridge rehabilitation, superstructure replacement, HMA preventative maintenance, and small-structure and drain work on I-69 from SR 37 to SR 13 in Hamilton and Madison counties. The consultant will provide environmental documentation and permits, public involvement, surveying, road and bridge design, utility coordination, hydraulic analysis and design, right-of-way plan development, pavement design, traffic management, and construction-phase services. Wetland mitigation, archaeological and historical/architectural investigations, and subsurface utility engineering may be added if needed; INDOT will perform geotechnical work, right-of-way acquisition, and real-estate closing.
Indiana Department of Transportation
State AgencyIN
Posted
Oct 13, 2026
Oct 27, 2026
The selected firm will prepare design and plan-development work to produce construction contract documents under INDOT standards and the designated letting schedule. The scope includes environmental documentation, permits, public involvement, right-of-way plan development, topographic survey, road and bridge design, hydraulic analysis and design, pavement design services for Des. 2600562, and construction-phase services. Wetland mitigation, archaeological and historical/architectural investigations, and subsurface utility engineering may be added if needed; INDOT will perform geotechnical services, right-of-way buying and real-estate closing, and pavement design for deck overlays and small-structure replacements.
Indiana Department of Transportation
State AgencyIN
Posted
Oct 7, 2026
Nov 5, 2026
Work includes approx 145 CY of excavation, common; 672 LF of linear grading; 800 SY of milling, transition; 900 LF of joint adhesive; 1,334 SY of asphalt for tack coat; 294' of guardrail, mgs w-beam, 6'3" spacing; 184 SY of reinforced concrete bridge approach, 12 in; 1,000 SY of mulched seeding, type r; 120 SF of patching concrete structures; 130 SF of bridge deck patching, full depth, and associated works.