CityIA
Posted
Oct 6, 2026
Oct 20, 2026
Orleans Avenue Water Main Improvements Project (S. Roswell Street To 6th Avenue) RFP
Construction of approx. 2,300 LF of 8" water main and boring under the existing drainageway.
Description: Provide qualified professional consultant engineering firms (engineer) with expertise in designing water main replacement projects.
SpecialDistrict · PA, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CityIA
Posted
Oct 6, 2026
Oct 20, 2026
Construction of approx. 2,300 LF of 8" water main and boring under the existing drainageway.
CityOH
Posted
Oct 5, 2026
Oct 27, 2026
Project includes directional boring installation of HDPE drinking main water supply conduits of varying sizes at a total length of approx 43,391 horizontal LF and 186 taps with 14 fire hydrants and 2 flush hydrants. The base bid project also includes a complete water pressure booster station with site improvements and a commercial two-lane water filling station. Bid alternate #1 project includes a commercial single lane water filling station.
CityIL
Posted
Oct 2, 2026
Dec 1, 2026
Work includes construction of 8" and 6" water main installed by open cut construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; abandonment of existing water main; sanitary sewer removal and replacement; storm sewer removal and replacement; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection; and all other work necessary for a complete and functional water main installation as shown, specified, or required.
CityIA
Posted
Oct 1, 2026
Oct 29, 2026
New water main will create a loop, improving water quality, as well as include 8 services to property owners on Y Avenue. The construction improvements include the construction of approx., 4,520 LF of trenched 6" water main, 460 LF of trenchless 6" water main, 8 water service connections, 5 fire hydrant assemblies, 6 valves, 2 connections to existing water main, 20 LF of 8" sanitary sewer removal and replacement, 390 LF of trenched storm sewer ranging from 12" to 36" in diameter, 151 SY of full depth HMA pavement patches, 417 SY of granular driveway and 86 SY of HMA driveway. Other associated improvements include fittings, traffic control, erosion control, surface restoration, and miscellaneous work necessary to complete the project. The alternate bid includes approx., 4,520 LF of trenched 8" water main and 460 LF of trenchless 8" water main as opposed to 6" water main. Other associated modifications include the replacement of 6" valves and fittings with 8" equivalents as necessary to complete the project.
Decision makers connected to this RFP from Capital Region Water.