Wisconsin Department of Natural Resources
State AgencyWI
Posted
Sep 25, 2026
Oct 26, 2026
Description: The Wisconsin Department of Natural Resources is soliciting construction bids to restore a wetland on the Piechowski property in Waupaca County. Work may include site preparation, 400 linear feet of ditch plugs, microtopography excavation and fill, erosion control, and cover-crop seeding when appropriate. The restored property will become a wetland mitigation site in the Wisconsin Agricultural Mitigation Bank.
StateAgency · WI, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Wisconsin Department of Natural Resources.
Adjacent opportunities open for bidding right now.
Wisconsin Department of Natural Resources
State AgencyWI
Posted
Sep 25, 2026
Oct 26, 2026
The Wisconsin Department of Natural Resources is soliciting construction bids to restore a wetland on the Piechowski property in Waupaca County. Work may include site preparation, 400 linear feet of ditch plugs, microtopography excavation and fill, erosion control, and cover-crop seeding when appropriate. The restored property will become a wetland mitigation site in the Wisconsin Agricultural Mitigation Bank.
Anoka County Soil And Water Conservation District
Special DistrictMN
Posted
Oct 14, 2026
Nov 10, 2026
Work includes approx 14,463 CY common excavation-pond; 1 LS site restoration; 7,790 LF install and removed perimeter control; 120 CY class III riprap.
CityNC
Posted
Sep 30, 2026
Nov 17, 2026
Work under this contract will include construction of a stream and wetland restoration, stormwater outfall modifications, earthen embankment and water control structure, retaining walls, greenway trail, maintenance path, pedestrian plazas, and hardscaped areas.
Iowa Department of Agriculture and Land Stewardship
State AgencyIA
Posted
-
Oct 27, 2026
This project is for a Breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheetpile installation, tile installation, aluminum water control structure, stoplog storage structure, riprap with concrete grout and seeding. This project includes just under 6,000 CY of earthwork, 2,172 SF of steel sheetpile, 378 LF of pipe installation, 672 tons of riprap, aluminum water control structure, aluminum CMP riser inlet, 118 cubic yards of concrete grout and 17.3 acres of seeding.