CityFL
Posted
Oct 13, 2026
Nov 12, 2026
Wastewater Collection System Repairs - Phase 1 RFP
Work inlcudes wastewater collection system repairs.
Description: Flagger and signaler for phase 3 lakes and ponds area collection system and pumping station - work consists of furnishing MassDOT certified road flaggers, traffic control personnel, and traffic control equipment on an as needed basis.
City · MA, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Town of Orleans.
These related opportunities are still open for bidding.
CityFL
Posted
Oct 13, 2026
Nov 12, 2026
Work inlcudes wastewater collection system repairs.
CityWA
Posted
Oct 7, 2026
Nov 4, 2026
Construct a 1,000 gpm triplex wastewater lift station including: Wet well and valve vault, electrical power and controls, pumps, piping and valves and a standby emergency generator; site work including sheet pile and solider pile shoring, cast-in-place concrete retaining wall, demolish existing structure, excavation and haul, site grading, gravel surfacing and heated concrete driveway; site piping including 1" water service, hot box and RPBA; and site improvements including a jib crane, fencing and gates. Install approx. 900 LF of 10" and 12" pressure sewer mains. Restore asphalt surfacing, concrete curbing and sidewalk.
North Gibson School Corporation
School DistrictIN
Posted
Oct 4, 2026
Nov 17, 2026
Work includes HVAC upgrades.
Wildblue Community Development District
Special DistrictFL
Posted
Oct 9, 2026
Nov 10, 2026
Work inlcudes wildblue shoreline stabilization