Posted
Oct 9, 2026
Nov 3, 2026
Arkansas Missouri Trail RFP
Project improvements to the project area will consist primarily of 10' wide concrete trail with strategic crossings and connections. The trail will span approx., 1,500 LF beginning with a tunnel or hawk signalized pedestrian crossing. This will include, but not limited to; removal of trees and railroad crossing. New construction includes, but not limited to; concrete trails, ramps, curbs and gutters, asphalt paving, concrete paving, median islands, striping, and storm drainage structures and pipes.
