Los Angeles Unified School District
School DistrictCA
Posted
Sep 25, 2026
Oct 19, 2026
Formal IFB McAuliffe Early Education Center - Outdoor Classroom (PSA)
Early education center - outdoor classroom.
Description: General Construction, Plumbing Construction and Electrical Construction Contracts. This project is a comprehensive renovation of the last remaining part related to the recreation area, covering the playground, splash pad and water features. Minor renovations to the athletic support building, with various site improvements such as fencing, walkways, concrete and asphalt pads, retaining walls and added lighting, and security features. The playground is expanded and resurfaced with poured-in-place rubber, bounded by a new perimeter curb and a new aluminum fence matching the existing, small areas these salvaged fences are reused. Site paving includes new concrete walkways, an asphalt replacement, and a new driveway seal at perimeter edge and a 20x34 pavilion building. The splash pad and water features are fully rebuilt: a new 6" custom-colored concrete splash pad, updated controls with watertight tie-ins, two new water features, and modified supply lines and junction boxes. The existing CMU support/building receives new door and openings reconfigurations to accommodate, a relocated overhead door, a gas-strut concession window, 2 new ADA restrooms restroom. New site amenities include a 34'×20' pavilion with integral lighting, an emergency generator, benches, tables, trash cans, and a shadow-box fence.
SpecialDistrict · PA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Los Angeles Unified School District
School DistrictCA
Posted
Sep 25, 2026
Oct 19, 2026
Early education center - outdoor classroom.
Charleston County School District
School DistrictSC
Posted
Jun 5, 2026
Oct 22, 2026
Design/Build: Construction of a new one-story 27,600 SF addition for 300 students on the existing elementary school campus. Also included are a 4,600 SF expansion to the existing Multi Purpose Room/Cafeteria and an 1,800 SF expansion to the existing Media Center Room.
School DistrictNC
Posted
Sep 3, 2026
Oct 14, 2026
Roof replacement at learning center.
Irvine Unified School District
School DistrictCA
Posted
Sep 14, 2026
Oct 22, 2026
Early Childhood Learning Center restroom renovation 2026.
Decision makers connected to this RFP from Reading Housing Authority.