Special DistrictCT
Posted
Sep 29, 2026
Nov 6, 2026
Cromwell Fire District - Water Interconnection Project
Work inlcudes 1,970 LF 12" di, cl 52 pipe; 20 LF 8" di, cl 52 pipe; 70 LF 6" di, cl 52 pipe; 1 LS 12" di - bridge hanging; 1 EA 12" tapping sleeve and valve; 2 EA 12" insertion valve; 8 EA 12" gate valve and boxes; 4 EA 6" gate valve and boxes; 1 LS interconnection station procurement and installation; 3 EA fire hydrant; 1 EA blowoff assembly; 1 EA sampling point; 100 CY exploratory excavations; 105 CY rock excavation. See attached file.
