CityFL
Posted
Jul 23, 2026
Oct 15, 2026
Phase 3 Lincoln Road Improvements: Lincoln Road Pedestrian Mall
Project consists of lincoln road pedestrian mall
Description: Phase 1 of the lincoln homes project will consists of the remediation and demolition of three existing structures, the abatement and rehabilitation of six single story multifamily apartment buildings (5 to 8 units per building), new construction of a 16-unit two-story multifamily apartment building, ancillary structures (trash enclosures, gazebo, etc. ), additional site improvements. Phase 2 of the lincoln homes project will consists of the remediation and demolition of 7 existing structures, the abatement and rehabilitation of 13 single story multifamily apartment buildings (1 to 6 units per building), new construction of a 16-unit two-story multifamily apartment building, ancillary structures (trash enclosures, playground), and the realignment of lincoln drive and other additional site improvements.
SpecialDistrict · TN, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityFL
Posted
Jul 23, 2026
Oct 15, 2026
Project consists of lincoln road pedestrian mall
CountyWA
Posted
Sep 23, 2026
Oct 19, 2026
Work include 0.10 ARCE of clearing and grubbing; 312 CY roadway exc. Including haul; 55 CY ditch excavation; 87 LF schedule a storm pipe, 12 diam; 2 EA catch basin type 1; 239 CY crushed surfacing top course; 22 tn HMA cl. 1/2 in 64h-28; 216 SY topsoil type c; 216 SY seeding and fertilizing; 1 LS erosion control and water pollution prevention ; 958 LF cement concrete traffic curb and gutter; 97 LF cement concrete Pedestrian curb; 1 LS ADA features surveying; 474 SY cement concrete sidewalk; 2 EA cement concrete Curb ramp type parallel a.
Special DistrictIL
Posted
-
Nov 4, 2026
Work includes clearing & grubbing, earthwork, erosion control, storm sewer, culverts, bridge pier modifications, new pre-engineered bridge, pavements, sidewalks, landscaping, seeding and other miscellaneous improvements associated with the trail.
Federal Aviation Administration
FederalDC
Posted
Aug 27, 2026
Oct 23, 2026
Expansion of the BEYOND program. The FAA will implement a BEYOND Phase 2 competitive selection process, through this SIR. This competitive selection process is not a procurement or acquisition under the FAA Acquisition Management System. The FAA did not develop any acquisition requirements for this competitive selection process, and the process will not result in the award of a procurement contract. Consistent with the FAA Administrator’s authorities under 49 U.S.C. §106(l) and (m), this process will result in the award of an Other Transaction Agreement (OTA). The FAA intends to award up to eight (8) OTAs through this solicitation. BEYOND Phase 2 has four programmatic focus areas: infrastructure, scalability, safety and automation. Five operational focus areas have also been identified as the greatest challenges that will need to be addressed for progress to be made: public safety, controlled airspace, remote, rural areas with inadequate infrastructure, on-airport operations and cross international borders.
Decision makers connected to this RFP from Clarksville Housing Authority.