CountyNM
Posted
Oct 10, 2026
Dec 1, 2026
ITB-27-02 - Zuber Draw Site No. 4 EWP
Chaves County seeks sealed bids for construction of the Zuber Draw Site No. 4 floodwater diversion structure (ITB-27-02). The site is about 11 miles south of Roswell and 8 miles west of Dexter, with access from Honolulu Road or W. Chickasaw Road. The County describes this as the third of up to three similar-scope projects that may be procured, administered, or performed separately or concurrently.
