FederalNC
Posted
Oct 13, 2026
Oct 26, 2026
Fort Bragg Landfill RFP
Enclose 3 sided structure within the landfill. Add mezzanine to the right side of the structure with first floor being utilized as office space and second story being used as open space. Work includes demolition; concrete; structural steel; architectural woodwork; doors, frames & hardware; drywall & framing; flooring; painting; signage; toilet partitions & bathroom accessories; window treatment; plumbing; HVAC; electrical; earthwork.
