CityOH
Posted
Jul 1, 2026
Oct 15, 2026
Myron Avenue Sewer Replacement Project
Work includes approx 900 SY pavement restoration; 510 LF 18" VCP item 706.08, C-700 ES; 190 LF 6" VCP sewer service connections; 1,100 SY asphalt planing and resurfacing.
Description: The City of Oceanside is seeking consultant engineering services for the Mission Avenue water and sewer relocation project. The listed scope includes project management, data collection and review, a flow study, site evaluation, permitting, geotechnical services, surveying, grant assistance, environmental services, and preparation of construction documents. This is an active, single procurement for professional services—not a grant program—and responses are due October 26, 2026, at 2:00 p.m. PDT.
City · CA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityOH
Posted
Jul 1, 2026
Oct 15, 2026
Work includes approx 900 SY pavement restoration; 510 LF 18" VCP item 706.08, C-700 ES; 190 LF 6" VCP sewer service connections; 1,100 SY asphalt planing and resurfacing.
CityCA
Posted
Sep 18, 2026
Oct 14, 2026
Work consists of the installation of around 3,100 lf of vitrified clay pipe (VCP) or high density polyethylene (HDPE) sewer line along with 12 new 48" maintenance holes and 1 new 60" drop sewer maintenance hole. The Work also includes removal and replacement or abandonment of existing sewer lines and manholes. Also included are dewatering, sewer flow bypassing, post-construction video inspection, pavement removal and replacement, trenching, backfilling and compacting.
CityGA
Posted
-
Oct 22, 2026
Relocation of water and sanitary sewer lines for the Curtis Parkway road widening. Work includes furnishing labor, equipment, and select materials to lay 4,500 L.F. 12" DIP, 900 L.F. 8" DIP, and 200 L.F. 6" DIP with hydrant, valves, service transfers, soil stabilization, driveway reconstruction, and erosion control measures.
CityCA
Posted
-
Oct 20, 2026
Work generally consists of mobilization, traffic control, implementing a water pollution control plan, relocating approximately 174 feet of 6inch sewer, removing an existing manhole, repairing/stabilizing roadway by installing a new retaining wall, cleanup of the project area, and other items of work as shown on the plans. Work includes 50 CY (f) roadway excavation; 1 LS erosion control; 210 SF asphalt paving; 174 LF 8" hdpe sewer main - open cut; 179 LF abandon existing sewer and fill with grout. See attached file.
Decision makers connected to this RFP from City of Oceanside.