FederalOK
Posted
Oct 7, 2026
Oct 21, 2026
AMXG Aircraft Painters Follow-On RFP
The contractor shall provide all labor and technical services for depot on-site paint and de-paint operations.
Description: Provide aircraft parts panel,torque box fairing eccentric,engine co guard,negator,paratroop door lever,lower pulley cover assembly,flap drive control link,engine condition lever bracket assy,switch wedge,friction lock sling,aircraft maintenance duct assembly,air conditioning-heating,a slide,shutdown control panel,outer wing,trailing edge fairing,aircraft fitting assembly,nose landing gear attac sling fitting,sidewall litter universal joint,nonvehicular coupling,shaft,flexible guard,mechanical drive gear,worm.
Federal · VA, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from DLA Aviation.
Adjacent opportunities open for bidding right now.
FederalOK
Posted
Oct 7, 2026
Oct 21, 2026
The contractor shall provide all labor and technical services for depot on-site paint and de-paint operations.
The University of Texas at San Antonio Police Department
Police DepartmentTX
Posted
-
Dec 31, 2099
Bids are requested for the San Pedro II Level 6 & 7 Build Out project.
FederalDC
Posted
-
Oct 15, 2026
The Federal Maritime Commission has posted a special notice of its intent to issue a logical follow-on for voice and data services to Lumen Technologies Government. The follow-on is intended to maintain continuity of the commission’s communications services. It is a notice of intent, not a competitive request for proposals or a grant opportunity.
Special DistrictTX
Posted
Sep 25, 2026
Oct 22, 2026
Trinity River Authority of Texas is soliciting proposals for Package No. 6, aeration blower equipment procurement, under the ROCRWS Phase 2 Expansion CMAR project. The broader Red Oak Creek Regional Wastewater System expansion increases capacity from 6.0 to 12.0 million gallons per day, with Phase 2 increasing it from 8.0 to 12.0 million gallons per day. The posting schedules a pre-bid meeting and site walk at the Red Oak facility and instructs attendees to bring protective equipment.