Tuolumne Boulevard Pavement Rehabilitation
Work consist of 3,572 lf of sawcut pcc and ac, removal and installation of striping, markings and signage, earthwork, grading, off haul, relocation, or reinstall, 435 sf of concrete flatwork in pedestrian median islands, 19,053 sf of concrete flatwork, 2,403 lf of construct curb and gutter, 1,238 sf of concrete flatwork 8" inches thick (driveways or vehicle areas), 7 ea of led street light (single arm, includes pull boxes, poles, conduit, wires and installation), 2 ea of led street light (dual arm, includes pull boxes, poles, conduit, wires and installation). See attached file.