Taylorsville City Bridge Replacement RFP
Work consists of new bridge/bridge replacement. Includes 59 SY of remove concrete sidewalk; 40 SY of remove concrete driveway; 33 remove concrete flatwork; 369 SY of remove asphalt pavement; 178 CY of roadway excavation; 29 ft of drainage pipe - 30", reinforced concrete, leak- resistant; 107 CY of untreated base course; 122 TON of hma - 1/2"; 560 SF of of concrete sidewalk; 192 ft of concrete curb and gutter type; 537 SF of concrete flatwork, 4" thick; 348 SF of concrete driveway flared, 7" thick; 230 SY of stabilization geotextile; 177 CY of granular backfill borrow; 127 SF of landscaping restoration; 132 SF of landscape restoration; 22 SY of spread salvaged topsoil; 22 SY of broadcast seed; sign type a-1, 12" x 24"; sign type a-1, 30" x 30".