New additions - construction of three new building additions: addition a- two-story classroom wing to house sixth grade (approx. 62,500 sf); addition b- one-story gymnasium wing (approx. 15,750sf) and addition c- one-story cafeteria expansion (approx. 5,850sf). A two-story addition includes arts classrooms, science classrooms, general classrooms, small group instruction classrooms, nurse office suite, main office, guidance office suite, main entrance with security vestibule, and toilet rooms. Courtyard created by two-story addition provides hardscaped outdoor classroom area. Renovations - existing auditorium and stage area, existing cafeteria and kitchen areas, existing music classrooms, existing science classrooms, existing general classrooms, existing life skills classroom, and various multiple and single occupant toilet rooms. Rehabilitations - roof replacement, electrical service upgrades, replacement of emergency generator, domestic hot water heating system and misc. Classroom work. Alterations - existing main office area reconfigured to child study team office suite, existing general classrooms reconfigured to small group instruction classroom and o. T. /p. T. Classroom, existing general classroom reconfigured to athletics team storage, existing small group instruction classroom reconfigured to new receiving area, and existing girls’ and boys locker rooms reconfigured to renovate toilet rooms and provide gymnasium storage; site development - additional parking lots, including a new expanded parking lot adjacent to the existing gymnasium with new driveway from gainsboro road. new parking lot at rear of middle school adjacent tennis courts; driveway alterations at existing driveway to princeton turnpike. New drop off/pick up driveway and parking lot alterations; above ground and below ground stormwater basins and related work.