Posted
Sep 8, 2026
Sep 23, 2031
Medium Unmanned Surface Vessel (MUSV) Phase II Integration and Testing
Medium Unmanned Surface Vehicles (MUSV) Phase II Integration and Testing.
Description: South Bay Union School District seeks a qualified General Engineering Contractor (License A) to remove existing playground surfacing at six school sites, install a new Class 2 base and poured-in-place rubber surfacing, and paint existing structures. This is a fixed-price public-works project requiring prevailing-wage compliance and DIR registration, with 10% bid security and performance and payment bonds each equal to 100% of the contract price. The bid opening is November 4, 2026, at 1:00 p.m.; construction is scheduled for December 1, 2026, through June 30, 2027.
SchoolDistrict · CA, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from South Bay Union School District.
Adjacent opportunities open for bidding right now.
Posted
Sep 8, 2026
Sep 23, 2031
Medium Unmanned Surface Vehicles (MUSV) Phase II Integration and Testing.
CityNJ
Posted
Oct 7, 2026
Oct 29, 2026
The City is re-advertising bids for the High Street Improvements – Phase II project, which the earlier project notice identified as High Street Downtown Sidewalk Improvements – Phase II. The City's resolution says plans and specifications have been prepared and invites bids from a qualified company to undertake the project work. The earlier contract award to Diamond Construction was rescinded after the contractor abandoned the project.
CityNC
Posted
Mar 17, 2026
Oct 21, 2026
Construction staking and survey; temporary construction entrance (install); temporary construction entrance (remove); site demolition (existing pavement, RCP, masonry); vegetatiion clearing (including tree stump removal and haul off); erosion control - inlet protection; erosion control fencing; temporary diversion ditch; earthwork / grading; drainage structures (drop inets & grates); drainage structures (outlets); drainage RCP - 18".
CityNC
Posted
Sep 30, 2026
Oct 20, 2026
Repairing damaged areas of the playground pour in place. The contractor shall cut out damaged areas of pour in place and repair those areas with patches.