Works include approx. 200 SY Solid Sod; 200 SY Grassing and Mulching; 150 LF of Silt Fence; 2,100 SF FDOT #57 Gravel for Lift Station inc geofabric, 8" thick; 1,850 SF Aggregate Driveway; 1 LS Water Line Connection.
Furnish all labor, materials, equipment, and incidentals required to access the site to perform the demolition activities, constructing the new electrical building, and required upgrades including installation of new owner furnished switch gear and VFD’s to the existing facilities in accordance with the contract plans. Contractor will also need to coordinate with the other Contractor working on site to build a new tank and bypass piping. Major items consist of mobilization/demobilization, permitting, demolition, civil/site work, structures, mechanical HVAC, and electrical & instrumentation.
Buyer Attributes
Key metrics and characteristics
City
The city where this buyer is located.
Pensacola
County
The county where this buyer is located.
Escambia
Address
Physical address of this buyer.
9255 Sturdevant St
Phone Number
Contact phone number for this buyer.
(850) 476-0480
Zip Code
Postal code for this buyer's location.
32514
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
CautiousAggressive
Higher is better Unlock
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
ConservativeEarly Adopter
Higher is better Unlock
Startup Friendliness
How often this buyer champions startups and early adoption.
Effective: Feb 5, 2015Expires: Sep 30, 2026Expiration date locked.
This agreement details an application for an irrigation meter, specifying that the water is solely for irrigation and must not be discharged into the sewage system to avoid additional fees. It also informs the applicant of potential extra connection fees due to Florida Department of Transportation (FDOT) road work requirements for connections to ECUA water/sewer on State roads.
Contract data
Get full contract and spend data
See expiring contracts, renewal timing, pricing history, and competitor awards, then sync the data to your CRM.
Board meetings and strategic plans from Emerald Coast Utilities Authority
Ecua Board Board Meeting
Date: Sep 22, 2026Type: Meeting mention
The board meeting featured public forum sessions where residents raised concerns. One resident discussed ongoing construction issues, including noise, debris, and complications with a sewer lateral hookup, leading the board to direct staff to address these problems and coordinate a resolution. Another resident requested assistance with obtaining appropriately sized trash and recycling bins, which the board agreed to facilitate.
The board meeting primarily addressed rate setting resolutions for the upcoming fiscal year. The board approved a 3% increase in water and wastewater rates and a 2% increase in sanitation service charges. Additionally, the board held an open forum where a member of the public raised concerns regarding infrastructure upgrades and long-term groundwater monitoring at the Escambia Wood treatment Superfund site in relation to proposed industrial development.
Ecua Cac Meeting
Date: Aug 18, 2026Type: Meeting mention
Key Contacts
Public-sector contacts connected to Emerald Coast Utilities Authority.
The board discussed several items, including an update on the closing of Santa Rosa Sound after the Blue Angel Air Show, a progress report on backflow preventers, and the McCorvy water treatment plant timeline. General resolutions were passed, including the authorization for an engineering service proposal from HDR Engineering, Inc. for the replacement of a water treatment facility at the Haggler well using PFAS settlement funds, an extension of the contract with Calgon Carbon Corporation for carbon media supply, and a renewal of the electric motor and pump repair agreement with Gulf Coast Electric Motor. Staff clarified that while the requirement for backflow preventers was part of a consent order, they are actively seeking solutions and pausing enforcement regarding water disconnection.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track Emerald Coast Utilities Authority meetings, strategic plans, and budget discussions before the public bid appears.